The Bauma M47-5 iONTRON is equipped with the large 190 m³/h concrete pump .19 iLS and can work environmentally friendly.
Putzmeister now also offers a cost-effective and easy entry into the electrified world of construction machinery: the iONTRON Lite with automatic start-stop – this means that selected functions can be operated electrically, saving diesel. Perfect for efficient working with reduced emissions.
You see the M47-5 on the booth with the following configuration:
Chassis: Mercedes Benz AROCS 3751, Euro 6
Placing Boom: 46.1m Vertical reach, 5 arms, RZ-folding
Concrete Pump: 190 m³/h Output, 250 mm Delivery Cylinder Diameter, 2100 mm Stroke Length
Highlights of this machine:
- iONTRON Lite for agitator and cleaning
- Full FLEX Support
The fully flexible outrigger gives you all the freedom you need when space on the construction site is tight again.
These are the options of the bauma machine
■ Europe KIT
- iSC (intelligent Setup Control)
- DE/EU road approval KIT
- Warning signal, boom not in cradle
- Holder for hammer and trowel
- Pressure gauge for centralized lubrication system
- Splash guard foldable
High Line Equipment
- Support plates (4x), in 2 magazines, closed (instead of open)
- Indicator lights on support legs, front and rear, LED
- High pressure water pump 100 bar, with dry-run protection
- Horn at boom, mushroom button yellow, mounted on hopper
- Inner panel on flatbed
- Timber wood 8x1000 in magazine (pos. depends on mounting)
- Spotlights 4x for illumination support area, LED
- Vibrator, radio remote/local controlled
- Boom rear lights on AP, LED
- Stowage compartment, RAL 7016 grey
- Water hose reel for water pump
LED lighting in foldable splash guard
The LED lighting in foldable splash guard brings light to the hopper area

iONTRON Lite hybrid drive
Proline 3000 - Twin layer pipe
Wear resistant delivery line,Twin layer pipe, 85 bar, up to 67 HRC
End hose squeezing valve (EQV)

SH Safety End hose 3m DN 125 split (1m+2m)

Additional Mushroom button (black) for water pump, mounted left on hopper

Stowage compartment, RAL 7016 grey


All around camera-system 360°, CAMOS

■ Spotlights 4x for illumination support area, LED
■ Indicator lights on support legs, front and rear, LED
■ Central boom lubrication, electrically
■ High pressure water pump 100 bar, with dry-run protection
Stowage compartment for couplings in support leg, left
Rear lighting on bottom, slewable
Protected from damage, e.g. by a truck mixer. The lamps of the ordered chassis are integrated into the frame.
End hose 3m DN125, split (1m+2m) incl. End hose squeezing valve (EQV)
The split end hose enables you to use an end hose squeezing valve and a reduction hose for working in tight formwork

By-flow filter
The By-flow filter extends the lifetime of the hydraulic oil by providing an additional filter
Cable remote control
reliable backup, e.g. in case of problems in the radio link.

iBC (intelligent Boom Control)
iBC enables the easy control of the boom with the Joystick using just one hand. As a result, the end hose can be moved forwards, backwards or diagonally at the preselected height with a great deal of precision.
LED Working light at boom tip
The iLS pump generation - intelligent Low Stroke – for more power and maximum service life

The heart of every truck-mounted concrete pump is the pump itself. Its mode of action, durability and operability are the economic indicators and determine the success of your operations. This is precisely the basis of the iLS pump generation, which delivers significantly improved data across the board. The iLS pump generation is the logical advancement of the tried and proven HLS generation
Special features:
■ Fuel savings of up to 25%
■ 3% increased efficiency through the prevention of leaks
■ 10 % better suction behaviour thanks to the elimination of constrictions in the concrete flow
■ Optimised drive unit
■ Maximum performance, minimum operating costs
■ Optimised conveying unit – ideal for the the heaviest concretes
■ Reduced wear for long service life
■ Optimised accessibility for maintenance and service
■ Automatic stroke correction without pump interruption
■ Field-tested and robust
■ Maximum quietness
- Home
- Bauma Impressions
- M67-5 Concrete Pump
- M47-5 Concrete Pump
- M42-5 Concrete Pump
- M38-5 Concrete Pump
- M27-4 Concrete Pump
- M24-4 Concrete Pump
- PUMI 31-4.79 S
- eMixer Gen2
- Truck Mixer P 9 G UL
- 3D Printer INSTATIQ
- GridXpress iONTRON
- BSA 1005 iONTRON
- BSA 1409 D5
- BSC 1409 D5 PL
- Mobile Telescopic Belt TB 130
- Precast 4.0 Automation
- Screed Factory TransMix 5.500 TML
- EstrichBoy DC 260
- EstrichBoy EC 260
- Liquid floor screed pump FHS 250
- Screed Conveyor Mixokret M 760 DHBS
- Battery driven Smoothing Machine
- Parts
- Proline Pipes
- Services
- P 720 TD Synchro Shotcrete Pump
- Wetkret 4 Shotcrete machine
- Worm Pump SP 11 LMR
- Worm Pump S 5 EVTM
- Mixer Pump MP 25
- Experts App
- Ergonic Edge
- MY Fleet
